Capacity Recovery Lab
Give your team
time back.
Find a practical change to meetings, admin, or rework. Estimate the opportunity, assign an owner, and check what changed after a pilot.
Start with an example. The initial numbers are illustrative assumptions. Replace them with team aggregates. Calculations run in your browser; nothing is uploaded. A saved draft stays on this device.
01 / Establish the baseline
Where does the week go?
Use averages from at least two representative weeks. Count each hour once: rework excludes time already counted as meetings or admin.
02 / Design a small pilot
Make a change you can test.
Reduction targets apply only to the relevant category. Adoption reduces the estimate further. Start with one change and leave unrelated targets at zero.
03 / Review the result
Did the change help?
After the pilot, enter observed team totals for the full follow-up period. Include meetings, admin, and rework using the same definitions as the baseline. Exclude one-off pilot setup hours; these are deducted separately. Leave blank until you have evidence.