Decision Intelligence/Capacity recovery
Capacity Recovery Lab

Give your team
time back.

Find a practical change to meetings, admin, or rework. Estimate the opportunity, assign an owner, and check what changed after a pilot.

Team-level inputsNo integration requiredTransparent calculations
Start with an example. The initial numbers are illustrative assumptions. Replace them with team aggregates. Calculations run in your browser; nothing is uploaded. A saved draft stays on this device.
01 / Establish the baseline

Where does the week go?

Use averages from at least two representative weeks. Count each hour once: rework excludes time already counted as meetings or admin.

02 / Design a small pilot

Make a change you can test.

Reduction targets apply only to the relevant category. Adoption reduces the estimate further. Start with one change and leave unrelated targets at zero.

03 / Review the result

Did the change help?

After the pilot, enter observed team totals for the full follow-up period. Include meetings, admin, and rework using the same definitions as the baseline. Exclude one-off pilot setup hours; these are deducted separately. Leave blank until you have evidence.